0510-85259317

What are the methods of assembly line adjustment?

CLICKS:651
Generally speaking, the assembly line is an effective combination of human and machine, which can fully reflect the production flexibility of assembly line equipment. It will transport system, which can be accompanied by jig and online special aircraft, the effective combination of detection equipment online production, in order to meet the requirements of the flow of a variety of products. The transmission mode of the assembly line is synchronous transmission of the forced type can also be asynchronous transmission flexible type, according to the choice of configuration, and then can achieve the requirements of assembly and transportation. For the transmission line in the enterprise's mass production is indispensable, for the enterprise to save labor costs, improve production efficiency.
 
Conveying line is mainly to complete its material conveying task. Around the warehouse, production workshop and packaging workshop of the site, set up by many belt conveyor, roller conveyor and other components of a conveyor chain, connected by the end to form a continuous conveyor line. At the entrance of the material and out of the sorting type conveyor line - conveyor mouth is provided with and path fork device, lift and ground conveyor line.
 
Thus in the warehouse, production workshop and packaging workshop within the scope of the formation of a smooth to each production position at the same time is closed circulation conveyor line system. All materials, parts, components and finished products used in the production process must be placed in pallets with bar codes before entering the conveyor system. Under the action of production orders issued by the production management system, pallets containing materials enter the conveyor line system from designated inlets. Check the deviation value of the two planes of the head and tail frame mounting bearing seat. If the deviation between the two planes is greater than 1mm, the two planes should be adjusted in the same plane. The adjustment method of the head drum is: if the conveyor belt deviates to the right side of the drum, the bearing seat on the right side of the drum should move forward or the bearing seat on the left side should move backward; If the conveyor belt deviates to the left side of the drum, the bearing seat on the left side of the drum should move forward or the bearing seat on the right side should move backward. The adjustment method of the tail drum is just opposite to the head drum.
 
  • Wuxi Xin Yusheng explosion-proof technology Co., Ltd.
  • Telephone:0510-85259317
  • FAX:0510-81819613
  • Email:xinyusheng@xysfb.com
  • ADD:Southeast corner of the fourth floor of Workshop 1, No. 242 Xitai Road, Meicun Street, Xinwu District, Wuxi City, Jiangsu Province